Bidding Opportunity

County Road 103 (Peaceful Valley Road) Bridge Over Middle Saint Vrain Creek

Due Date: 08/14/2024 2:00 pm
Bidding Number: BID-090-24
Bidding Categories: Public Works
Pre-bid Date and Time: 07/30/2024 11:00 am
Pre-bid Location:

An Optional Pre-Bid Meeting will be conducted on July 30, 2024 at 11:00 a.m., on Microsoft Teams. To attend remotely please click on the link in the Optional Pre Bid Meeting Document in Bonfire or use the call-in number.

Other Comments:

This project consists of removal of existing channel material, adding new riprap scour countermeasures and infill of voids below existing abutments. The project also includes temporary creek diversion and access, and temporary erosion control best management practices, to minimize construction impacts to Middle St. Vrain Creek.

Proposals must be submitted electronically on or before the Close Date at https://bouldercounty.bonfirehub.com/. Submissions will not be accepted by email, fax or hand-delivery; unless otherwise noted.

Documents should not be embedded within uploaded files, as the embedded files will not be accessible or evaluated.

Submittal Instructions BID-090-24