Stage 1 Fire Restrictions in effect for unincorporated plains areas east of Highway 93 (South Foothills), Broadway, and US 36 (North Foothills)

Measles cases have been identified within BVSD. Visit the CDPHE measles website for more information.

Saturday, March 21, High Fire Danger Day. No Open Burning in Boulder County.

Bidding Opportunity

Scour Critical Bridge Repairs (Peaceful Valley and 84W)

Due Date:

04/21/2026 2:00 pm

Bidding Number:

BID-260-26

Bidding Categories:

Public Works

Pre-bid Date and Time:

03/31/2026 1:00 pm

Pre-bid Location:

Please register in Euna (formally Bonfire) to access virtual meeting information.

A non-mandatory pre-bid meeting will be conducted on March 31, 2026, starting promptly at 1:00 p.m. on Microsoft Teams.

Other Comments:

Background:
Contractors have the option to bid on the Peaceful Valley Bridge Repair, 84W Bridge Repair, or combined to show cost savings for awarding both projects to the same contractor. These projects consist of removal of existing riprap, installation of new riprap scour countermeasures, and infill of voids under bridge abutments. These projects also include temporary creek diversion and access, and temporary erosion control best management practices, to minimize construction impacts to North Saint Vrain Creek.

Scope of Work (84W and Peacful Valley):
This project consists of removal of existing riprap, installation of new riprap scour countermeasures, and infill of voids under both bridge abutments. This project also includes temporary creek diversion and access, and temporary erosion control best management practices, to minimize construction impacts to North Saint Vrain Creek.

Submittal Instructions BID-260-26