Stage 1 Fire Restrictions in effect for unincorporated plains areas east of Highway 93 (South Foothills), Broadway, and US 36 (North Foothills)

CDPHE has confirmed two measles cases within BVSD. Visit the measles website for exposure locations.

Bidding Opportunity
**The due date for this bidding opportunity has passed**

Sugarloaf Road at Bummers Gulch Construction Project

Due Date:

04/03/2025 2:00 pm

Bidding Number:

BID-137-25

Bidding Categories:

Public Works

Pre-bid Date and Time:

03/24/2025 9:00 am

Pre-bid Location:

A Non-Mandatory Pre-Bid meeting will be conducted on Monday, March 24, 2025 at 9:00 a.m. on Microsoft Teams. Please register in Bonfire to access to documents and link to meeting.

Other Comments:

This project consists of the replacement and realignment of two minor structures on Sugarloaf Road. One culvert at the intersection of Sugarloaf Road and Betasso Road, and the other culvert at the crossing of Bummers Gulch and Sugarloaf Road. The culvert replacement will require full depth reconstruction of the existing roadway over the top of the culvert crossings.

Submittal Instructions BID-137-25