Inspection Coordination & Scheduling
Inspection Requests
All inspection requests (including virtual & photo submittals) must be received through the automated inspection scheduling system before 3:30 p.m. (Monday through Thursday) in order to be eligible for the following business day scheduling. All requests received after 3:30 p.m. on weekdays, or during weekends, will be put in the queue for inspection requests for the following business day. Although every effort will be made, next day inspections are not guaranteed and the time of the inspection cannot be guaranteed.
Re-Roof & Temporary Electric Meter Release Inspections Now Being Reviewed Using Photos
Re-roof and temporary electric meter release inspections are now being conducted through photo documentation provided to the Building Inspectors by the contractor.
Once the Roofing or Temporary Meter is complete, please:
- Call the automated scheduling system to schedule the inspection.
- On the day of the scheduled inspection, please submit the Roofing or Temporary Meter photos for review.
Re-Roof
Photos to include:
- Exterior of the property with the address clearly visible
- Overall view of roof
- Step and counter flashing around chimneys, vertical wall flashing, kickout flashing, eave and gable drip edge flashing, and parapet capping
- Gutters, gutter coverings and downspouts
- Roof valleys
Temporary Electrical Meter
Photos to include:
- General picture of all the equipment and location
- Grounding and bonding
- Dead front to be removed to see all conductors and connections
- Meter cabinet open
- GFCI breakers or GFCI receptacles
After receipt of the photos, the Boulder County Building Inspection Team will review the photos within 24 hours and inspection results will then be available on the Building Permit Records Page.
Roof Mounted Photovoltaic Systems & Wallboard Inspections
At the discretion of the Building Inspector – Roof mounted photovoltaic systems and wallboard inspections may be conducted through photo documentation.
Please note: These inspections must be scheduled as an on-site inspection. If it is determined that an on-site inspection is not possible, the inspector will contact the contractor the morning of the inspection and provide them with the photo submittal option.
Photos should be submitted using this online inspection request form.
Photovoltaic Systems
Photos to include:
- Exterior of the property with the address clearly visible
- General picture of all the equipment and location
- Verify working clearance of all new equipment
- All raceways and supports
- Close up of inverter, rapid disconnect, fused disconnect, combiner boxes, and production meter cabinet will be required
- All circuit panel wiring, including all taps (i.e., line side or load side)
- Inside all electrical junction boxes
- GES (grounding electrode system) overview of the two ground rods, acorns, and cold-water bond clearly visible. Include location of bonding
- Warning labels and placards on all required locations, including raceways and junction boxes
Wallboard
Photos to include:
- Exterior of the property with the address clearly visible
- General picture of fire separation wall(s) and ceiling(s)
- Close up of penetrations
- Manufacturer’s stamp identifying drywall type
After receipt of the photos, the Boulder County Building Inspection Team will review the photos within 24 hours and inspection results will then be available on the Building Permit Records Page.
If you have additional questions, issues or concerns pertaining to photo documentation submittals, please reach out to the Building Inspectors via email at: buildinginspectors@bouldercounty.org
Pre-Rough Wildfire Inspections
All pre-rough wildfire inspections must be scheduled directly with your Wildfire Mitigation Coordinator:
Access and Engineering Inspection Requests
For Final Access and Engineering inspections, please schedule inspection code #82 by noon Thursday to be placed on the list of inspections to occur the following week. The Access and Engineering staff will reach out to the contact person to discuss the inspection and give a date and time of the inspection.
Scheduled inspections must be ready on the day requested, or a re-inspection fee may be charged. The re-inspection fee must be paid before re-scheduling. If you find that you will not be ready for a scheduled inspection, please call to cancel the inspection using the automated phone system. Inspections cannot be cancelled the day of the inspection using the automated phone system, so to cancel the day of the inspection please send an email to buildinginspectors@bouldercounty.org prior to 9 a.m. the day of the inspection.
All required inspections must be performed by Building Safety & Inspection Services with the exceptions of caisson, footing, and foundation wall inspections, as well as structural framing. These inspections may be performed by a qualified, state-licensed engineer.
Engineer inspections require an original signed and sealed inspection report submitted to the Boulder County Building Safety & Inspection Services office by email to ezbp@bouldercounty.org prior to the rough inspections.
Please check the back of your permit card for all required conditions for your project prior to scheduling inspection.