Small Renewable Energy Systems
Wind and solar energy systems can be either accessory uses (they only provide energy to the principaluse on the property) or principal uses (the only or primary use of the parcel is the renewable energy system itself). Smaller systems that meet certain requirements in the Boulder County Land Use Codemay be built with just a building permit. Smaller systems that cannot be approved with just a building permit may generally be approved through Site Plan Review Waiver (SPRW) or Site Plan Review (SPR) depending on the type of system and overall size of the proposal. Larger renewable energy systems require land use reviews as well, but these types of systems are not covered in this handout. All of these uses require Building Permits. For those systems that require SPRW, the typical pre-application conference is not required – you can use this Land Use Publication to prepare your application. Of course, staff is available to answer questions over the counter, over the phone, or at a Pre-applicationConference (if you would like one).
Submit your application for a Small Renewable Energy System online:
- Log in (create an account if you don’t have one), then select>
- “Start a New Application”>
- “Planning”> (Temporary technical issue: Blank tile squares can be viewed by hovering over each tile with your mouse)
- “Planning Application Request”>
- “Site Plan Review Waiver for Renewable Energy System.”
You can use our Small Renewable Energy System Checklist as a guide for what you will need for your application.
If you have any questions contact us at planner@bouldercounty.gov or 303-441-3930.